This shows what is happening with the front of the building.
This shows the view of the class room side (North side of the building closest to the temple)
On the right hand side of this drawing you see the class room building.
The building began in early September and will be completed in September of 2016. The capacity of the building will be triple what it is now (mid 300s).
No comments:
Post a Comment